The most recent estimates for the time frame, from the meeting held on June 24, 2019, are below:

  • Borings: 6/17-06/25 (1 week)
  • Lab Analysis:6/26-07/17 (3 weeks)
  • AE Analysis:7/17-08/14 (4 weeks)

Damage to roadway and guard rail

Bore sample drill holes – to determine composition of base material and depth of bedrock

Read the Preliminary Geotechnical Report

Learn more about soil nailing

Watch a video on soil nailing

Bald Top Update:

Carolyn DraganoBald Top Road, News

Preliminary readings from inclinometers on Bald Top road show a cumulative movement of 3/100th of an inch with depths varying greater than 20 feet. Because this information is so preliminary it is as yet inconclusive, the total of the readings planned being scheduled for three months. The Township is incurring costs in excess of $6,000 per month for the monitoring, … Read More

Bald Top Update from the Public Meeting held Monday, June 24, 2019

Carolyn DraganoBald Top Road, News

The most recent estimates for the time frame, from the meeting held on June 24, 2019, are below: ▪ Borings: 6/17-06/25 (1 week) ▪ Lab Analysis:6/26-07/17 (3 weeks) ▪ AE Analysis:7/17-08/14 (4 weeks) Once completed, work will begin on designing the method for the permanent repair. It will be the middle to the end of August before we can bid … Read More

Bald Top Road Safety Issue